*Click on thumbnails to enlarge the picture*

Project 1

This Project was done in my own house. As a homeowner, you are allowed to do all phases of

A Remodel like this. As a Contractor working on someone else's house, the Plumbing and

Electrical work needs to be done by a Licenses Plumber and Electrician.

Before Remodel

Framing

Wiring

Plumbing

Fixtures Are Installed

Tile Installed

Grout is Applied

Painting

Cabinet Installed

Trim and Molding

Floor Covering

 

Project 2

In this project the vanity, medicine cabinet and shower where replace, along with new vinyl flooring

And a new light installed. The homeowner did some of the work himself.

Vanity Before

Vanity After

Mirror Before

Mirror After

Shower Before

Shower After

Bathroom after Remodel